Flamingo Long Lead For Dogs

Flamingo Long Lead For Dogs

Price
Regular price €27.50
Regular price Sale price €27.50
Save €-27.50
Tax included. Shipping calculated at checkout.
Order before 2pm Monday to Friday for next day delivery
Out of stock. Free delivery over €49.
Description

The Flamingo Caspar lead in mint green is a biothane dog lead measuring see pack.

Biothane, which is polyester webbing with a PVC coating over it. That is the material long line people settle on in the end. It does not soak up water, it does not hold mud, it does not go stiff and it does not rot, so you can drag it through a wet field and wipe it clean. A fabric long line does all of those things and starts to smell within a month.

  • see pack
  • Biothane, polyester webbing with a PVC coating
  • Wipes clean, does not soak up water or hold mud
  • Made for tracking and long line recall work
  • Flamingo article 524058, barcode 5400585258479

Check the clip and the stitching next to it every few weeks. That is where every lead gives out first, and it always goes at the worst moment. Free delivery anywhere in Ireland once you spend 49 euro.

Common questions

Frequently asked.

Why doesn't this product show a specific brand?

The brand collection it belongs to may not be set up in the storefront yet, or it's a one-off line outside our main brand collections. Vetted to the same standard as anything else we stock.

How can I find out more about this product?

Email us with the product name. The shop floor knows the catalogue inside out.

Do you stock more of this brand?

Possibly. Email us and we'll check current stock and tell you what else of the same brand we can get for you.

Will this product become a proper branded collection?

If we end up stocking more of the brand, yes. The branded collections are how we organise the range as it grows.

Delivery and returns

Order before 2pm Monday to Friday and we dispatch the same day by DPD, next working day to most of Ireland.

Delivery is free over €49, a flat €6.95 under that.

Prefer to collect? Pick up at Enniscorthy or Wicklow once we email to say it is ready.

Changed your mind? Return unopened items within 14 days for a refund.

Joe in the shop

Questions about this product? Ask Joe in the shop or on WhatsApp.

Ask a question

This site is protected by hCaptcha and the hCaptcha Privacy Policy and Terms of Service apply.

You may also like
More from Flamingo
Sold out
Recently viewed