Flamingo Long Lead For Dogs 15mm
Properly priced. Same as in store.
Properly priced. Same as in store.
The Flamingo Caspar lead in fluo yellow is a biothane dog lead measuring see pack.
Biothane, which is polyester webbing with a PVC coating over it. That is the material long line people settle on in the end. It does not soak up water, it does not hold mud, it does not go stiff and it does not rot, so you can drag it through a wet field and wipe it clean. A fabric long line does all of those things and starts to smell within a month.
Check the clip and the stitching next to it every few weeks. That is where every lead gives out first, and it always goes at the worst moment. Free delivery anywhere in Ireland once you spend 49 euro.
The brand collection it belongs to may not be set up in the storefront yet, or it's a one-off line outside our 17 main brand collections. Vetted to the same standard as anything else we stock.
Email us with the product name. The shop floor knows the catalogue inside out.
Possibly. Email us and we'll check current stock and tell you what else of the same brand we can get for you.
If we end up stocking more of the brand, yes. The branded collections are how we organise the range as it grows.
Order before 2pm Monday to Friday and we dispatch the same day by DPD, next working day to most of Ireland.
Delivery is free over €49, a flat €6.95 under that.
Prefer to collect? Pick up at Enniscorthy or Wicklow once we email to say it is ready.
Changed your mind? Return unopened items within 14 days for a refund.
Questions about this product? Ask Joe in the shop or on WhatsApp.