{"product_id":"flamingo-long-lead-for-dogs-5mm","title":"Flamingo Long Lead For Dogs 5mm","description":"\u003cp\u003eThe Flamingo Caspar lead in fluo yellow is a biothane dog lead measuring see pack.\u003c\/p\u003e\n\u003cp\u003eBiothane, which is polyester webbing with a PVC coating over it. That is the material long line people settle on in the end. It does not soak up water, it does not hold mud, it does not go stiff and it does not rot, so you can drag it through a wet field and wipe it clean. A fabric long line does all of those things and starts to smell within a month.\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003esee pack\u003c\/li\u003e\n\u003cli\u003eBiothane, polyester webbing with a PVC coating\u003c\/li\u003e\n\u003cli\u003eWipes clean, does not soak up water or hold mud\u003c\/li\u003e\n\u003cli\u003eMade for tracking and long line recall work\u003c\/li\u003e\n\u003cli\u003eFlamingo article 524050, barcode 5400585252439\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eCheck the clip and the stitching next to it every few weeks. That is where every lead gives out first, and it always goes at the worst moment. Free delivery anywhere in Ireland once you spend 49 euro.\u003c\/p\u003e","brand":"Flamingo","offers":[{"title":"Default Title","offer_id":58263898292607,"sku":null,"price":18.5,"currency_code":"EUR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0990\/1074\/0607\/files\/524050_G_01.jpg?v=1789051359","url":"https:\/\/petshopnearme.ie\/products\/flamingo-long-lead-for-dogs-5mm","provider":"Pet Shop Near Me","version":"1.0","type":"link"}